The following materials comprise the LFEV-ESCM-2014 Preliminary Design Review.
NOTE: The materials on this page exist solely for the satisfaction of Deliverable D000. They should be considered out-of-date for all engineering purposes, and should not be referenced for technical insight into the system as delivered.
PDR Presentation (PDF)
Preliminary Work Breakdown Schedule
Preliminary ATP/Traceability Matrix