Proposal – Easton Wastewater Treatment Plant Project

Authored by: Lafayette College EGRS 480 Group 2012 (Matthew Keehn, Andrew Walsh, Melissa Downey, Ashley Springer, and Alicia Bartley)

Date: Spring 2012

Course Instructor: Professor Veshosky

PDF Link: EGRS 480 S’12 Easton Wastewater Treatment Plant Project Proposal

Abstract:

The Easton Wastewater Treatment Plant is considering changes to its sludge  handling and disposal processes, to reduce the high liquid content in the end  product and reduce disposal costs.   In this project, a team of Lafayette College  students in Sustainable Solutions, Engineering Studies 480, will examine current systems used by the plant and analyze alternative solutions, taking into account environmental, financial, and regulatory factors.  The team will focus on the possibility of a pipeline for methane gas from the nearby Chrin Landfill to provide power for the necessary equipment.