Welcome to the homepage for the Fall 2021 Capstone Reports in Engineering Studies. The page is the front door for our seven projects.

These are:

  1. Prospectus for a new Lafayette Clean Energy Center
  2. Course proposal for FYS: Solar
  3. Module design for ES 101: Engineering Studies
  4. Functional art at LaFarm
  5. Lower Hackett Urban Farm: a design plan
  6. Rinek Rope Adaptive Reuse
  7. Bridging Community and Arts on 3rd St.

The following links lead to a back catalog of prior capstone projects: the Fall 2020 projects are here; Fall 2019 projects are here; Fall 2018 here; Fall 2017 here; Fall 2016 here; Fall 2015 projects; Fall 2014 projects; and Fall 2013 projects.  Interested readers may contact the Engineering Studies office for full reports from the Spring 2013 and Spring 2012 classes.