Welcome to the homepage for the Fall 2021 Capstone Reports in Engineering Studies. The page is the front door for our seven projects.
These are:
- Prospectus for a new Lafayette Clean Energy Center
- Course proposal for FYS: Solar
- Module design for ES 101: Engineering Studies
- Functional art at LaFarm
- Lower Hackett Urban Farm: a design plan
- Rinek Rope Adaptive Reuse
- Bridging Community and Arts on 3rd St.
The following links lead to a back catalog of prior capstone projects: the Fall 2020 projects are here; Fall 2019 projects are here; Fall 2018 here; Fall 2017 here; Fall 2016 here; Fall 2015 projects; Fall 2014 projects; and Fall 2013 projects. Interested readers may contact the Engineering Studies office for full reports from the Spring 2013 and Spring 2012 classes.