Current TRL: # (date reached)
Description of the current tech readiness level.
Subsystem Full Title
Main picture or video for subsystem
Description of subsystem
Main Diagram Links
Design Proposal
Motivation for Problem Space
Conceptual Solution
Main Documents
- Literature Review (PDF) (Last Updated: x/x/xx)
- Test Plan (Type(Ex. PNG)) (Last Updated: x/x/xx)
- Full Model (Type(Ex.Google Drive)) (Last Updated: x/x/xx)
- Document Name (Type) (Last Updated: x/x/xx)
- Document Name (Type) (Last Updated: x/x/xx)
Components:
Subsystem Part #1
Picture or video of this part
Description of this part
Part #1 Documents
- Document Name (Document Type (Ex.PDF)) (Last Updated: x/x/xx)
- Document Name (Type) (Last Updated: x/x/xx)
Subsystem Part #2
Picture or video of this part
Description of this part
Part #2 Documents
Subsystem TRL Chart
TRL | What does this look like? | Expected Completion Date |
9 | Level 9 description | MM/DD/YY |
8 | Level 8 description | MM/DD/YY |
7 | Level 7 description | MM/DD/YY |
6 | Level 6 description | MM/DD/YY |
5 | Level 5 description | MM/DD/YY |
4 | Level 4 description | MM/DD/YY |
3 | Level 3 description | MM/DD/YY |
2 | Level 2 description | MM/DD/YY |
1 | Level 1 description | MM/DD/YY |
Our Team
Team Member 1 – Role
Team Member 2 – Role