Current TRL: # (date reached)

Description of the current tech readiness level.

Subsystem Full Title

Main picture or video for subsystem

Description of subsystem

Main Diagram Links

Design Proposal

Motivation for Problem Space

Conceptual Solution

Main Documents

  • Literature Review (PDF) (Last Updated: x/x/xx)
  • Test Plan (Type(Ex. PNG)) (Last Updated: x/x/xx)
  • Full Model (Type(Ex.Google Drive)) (Last Updated: x/x/xx)
  • Document Name (Type) (Last Updated: x/x/xx)
  • Document Name (Type) (Last Updated: x/x/xx)

Components:

Subsystem Part #1

Picture or video of this part

Description of this part

Part #1 Documents 

Subsystem Part #2

Picture or video of this part

Description of this part

Part #2 Documents 

  • Document Name (Type) (Last Updated: x/x/xx)
  • Document Name (Type) (Last Updated: x/x/xx)

Subsystem TRL Chart

TRL What does this look like? Expected Completion Date
9 Level 9 description MM/DD/YY
8 Level 8 description MM/DD/YY
7 Level 7 description MM/DD/YY
6 Level 6 description MM/DD/YY
5 Level 5 description MM/DD/YY
4 Level 4 description MM/DD/YY
3 Level 3 description MM/DD/YY
2 Level 2 description MM/DD/YY
1 Level 1 description MM/DD/YY

Our Team

Team Member 1 – Role

Team Member 2 – Role

Additional  Documentation

  • Document Name (Type) (Last Updated: x/x/xx)
  • Document Name (Type) (Last Updated: x/x/xx)
  • Document Name (Type) (Last Updated: x/x/xx)