The resources needed for the prototype are the following: 10 gallons of runoff water, a flow meter sensor, a mechanical whisk, water pipes, a water pump, and two ten-gallon plastic tanks. For the assembly creation of the prototype, the team will require room 002-A in AEC. This is due to the assumption that our prototype will be a large-scale project. Additionally, we potentially will need to see how our prototype fairs against actual weather conditions in the field; therefore Lafarm will be used as a testing ground as well. The cost of each required resource is the following: a 10 gallon tank that will collect the runoff water will be $60,  an electrical motor that will used to mix the bleach to the runoff water will be $100, a water pump that will transfer over the clean water to the sink will be $70, a flow meter sensor that will make sure the tank only collects 10 gallons of water will be $50, and a pvc pipe that connects the tank to the sink will be $80. The creation of the costs for each item is an estimate based on the market price of each item and finding the average costs.


Team Roles      Timeline      Team Charter      Project Management