Implementation Timeline

1/31/2025 intermediary progression
2/7/2025 Microcontroller Matter API
Smart Light (individual functionality)
2/14/2025 intermediary progression
2/21/2025 Hub to Smart Light (Matter) Testing
Kick Button (fully assembled)
Smart Window Shade (individual functionality)
2/28/2025 Hub to RSS Connection Testing
Kick Button to SMD Connection Testing
3/7/2025 Fully Integrated Smart Light Testing
Hub to SMD Connection Testing
3/14/2025 Fully Integrated Smart Window Shade Testing
Hub Video Streaming Testing
Smart Door Opener (individual functionality)
Smart Door Lock (individual functionality)
Smart Pill Box (individual functionality)
3/28/2025 Fully Integrated Smart Door (Opener + Lock) Testing
4/4/2025 Fully Integrated Smart Pill Box Testing
Smart TV (individual functionality)
4/11/2025 Fully Integrated Smart TV Testing
Smart Speaker (individual functionality)
4/18/2025 Fully Integrated Smart Speaker Testing
4/25/2025 Overall Integration Testing
5/2/2025 Medical Feasibility Testing (obtain feedback)